What should be his first order of business once President-elect Obama takes office?

Cutting taxes/economic recovery.
Promoting peace in Israel/Gaza.
Ending the war in Iraq.
Creating jobs/dealing with unemployment.
Addressing climate change/environmental issues.

View Results

Prevention of Mass Wasting

Proper design during construction projects can eliminate the potential for increased mass wasting. Human activities such as undercutting the base of the slope, adding weight to the upper part of the slope by building large structures, removing vegetation, and saturating the ground with water increase the risks of mass wasting. Engineering solutions include barriers and retaining walls, drainage pipes, terracing the slope to reduce the steepness of the cuts, and immediate revegetation. Rockfalls can be controlled or eliminated by the use of rock bolts, cables, and screens and by cutting back slopes to lesser gradients.

Cite this article

Video Interviews with Real Students
Get to know your top college picks without stepping foot on campus.
Watch now!
Prepare like a Pro with CliffsNotes AP Digital Flashcards
Get 100 AP Flashcards Cards Now — FREE!
Learn more!